Application Note

Application Note: Water Treatment Plant

Source: McCrometer, Inc.

By McCrometer, Inc.

Application: Measure the effluent flow in a 4-inch line from a Water Treatment Plant high service pump with extremely limited straight piping available.

Measurement Challenge/Difficulty: A pipe length of only 32 inches was available to install a meter from the discharge flange of a booster pump to a pipe reducer. The flow approaching the meter would be extremely turbulent as it left the pump.

access the Application Note!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Chemical Online? Subscribe today.

Subscribe to Chemical Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Chemical Online