Case Study

Piping Change Nearly Leaves Engineer Up The River Without A Paddle

Source: McCrometer, Inc.

By Mike Dyer, Applications Engineer, McCrometer

A short straight pipe run between a river water pumping station and a valve at the Eastman Chemical Company’s plant in Kingsport, TN, caused critical water flow measurement accuracy problems for the company. The piping configuration left the company’s Utility Division engineer with only a straight pipe run of 15 feet, which was insufficient in length for accurate water flow measurement with the existing orifice plate flow meter already in place.

 

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Chemical Online? Subscribe today.

Subscribe to Chemical Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Chemical Online